
Perfect Packet
Perfect Packet (PP) is Soligo’s internal checklist used to confirm that all required project details are complete and accurate. It ensures your contact information, utility details, financing documents, design inputs, and onboarding items are verified before your project moves forward.
This process helps prevent avoidable delays and keeps your solar installation on track.
What Perfect Packet Means for Your Home
Why it matters
Solar projects involve coordination between homeowners, financing providers, permitting offices, engineers, and utility companies. Missing or incorrect information can slow down the process.
The Perfect Packet confirms that key items are complete before major milestones begin.
Items typically reviewed include:
Homeowner contact information
Utility account details
Signed financing documents
Property ownership verification
System design inputs
Required disclosures and onboarding forms
By confirming everything early, Soligo reduces the risk of last-minute corrections or scheduling delays.

How it affects savings
Perfect Packet does not change how much energy your system produces, but it directly impacts your project timeline.
Several factors influence project flow:
Accuracy of financing documentation
Correct utility account details
Complete onboarding paperwork
Verified system specifications
When your file is complete, your project can move smoothly toward Notice To Proceed (NTP), Site Survey, permitting, installation, and Permission to Operate (PTO).
The sooner your system is installed and activated, the sooner you begin generating electricity and reducing your utility bill.

Where it shows up in the process
After Contract Signing: Your documents and project details are reviewed internally.
Before NTP: Financing paperwork and required information are verified.
Before Permitting: Design inputs and property information are confirmed.
Pre-Scheduling: The checklist ensures everything is ready before moving to installation.
Where You’ll See This in Your Solar Project
After you sign your Soligo Install Agreement, Soligo’s internal team reviews your file using the Perfect Packet checklist. This step ensures financing documentation, utility information, and design inputs are accurate and complete.
By verifying these items early, Soligo helps prevent delays during permitting, inspection, or installation scheduling. The Perfect Packet supports a smoother transition from paperwork to active project execution.
Soligo uses structured internal processes like Perfect Packet to maintain organization, accountability, and efficient project timelines.
Have questions about Perfect Packet (PP)? Speak with a Soligo Energy specialist today.